A deceptively simple tray, from a contradictory brief to the production line.
Ooni's dough proofing trays are a modular, injection-moulded polypropylene system for proofing and storing dough balls. I was design lead and the sole design engineer from consumer research and the brief right through to production release, covering the concept and industrial design, the tolerancing, DFM with the tooling supplier, and production support.
How the project ran, end to end
A tray sounds like the simplest product in the range, and that's exactly why it's a good example. With no electronics and no moving parts, everything comes down to the brief, the geometry, the tolerances and how it's moulded. As the only engineer on it, I took it through every stage.
Consumer research and the brief
I started with how people actually proof and store dough, and what customers said about the previous tray, then wrote the brief: fits in a fridge, holds six dough balls, nests for storage, and releases dough cleanly.
User insights · brief creationTurn the brief into a specification
Putting numbers on every requirement showed that five of them couldn't all be met at once. I proved that with hand calculations so the trade-off could be decided on evidence.
Requirements engineering · hand calculationExplore concepts and the industrial design
Concepts were sketched and modelled against the conflicting requirements, aiming for a minimalist look that sits well in a modern kitchen.
Concept design · industrial design · CMFPrototype and test
Printed prototypes let me check nesting, stacking, lid fit and dough release by hand before any steel was cut.
Rapid prototyping · physical testingTolerance and DFM with the toolmaker
Statistical tolerance stacks for every way the parts fit together, plus draft, wall thickness and flow length worked through with the tooling supplier.
Tolerance stack analysis · DFM · draft analysisProduction CAD and the drawing pack
Manufacturing-ready CAD and a full technical drawing pack, with all the project documentation managed alongside it.
Production CAD · GD&T · technical documentationTooling and production support
I supported the supplier through tooling, checked the first articles against the analysis with CMM data, and released the product to production.
Supplier collaboration · first-article inspection
What this project called on
Making a usable specification from an impossible brief
Each requirement in the brief made sense on its own. The trays had to fit in a fridge for cold proofing, giving a maximum outer envelope of 420 × 320 × 100 mm. They had to hold six 250 g dough balls, like the old tray, so the inside had to be at least 365 × 265 × 70 mm. They had to nest to save space in shipping and storage, they mustn't wedge together, and there could be no internal features, because those make it hard to get the dough out.
Together, they couldn't all be satisfied. Nesting needs draft, and draft plus fixed inner dimensions eats into the fixed outer envelope. Stopping the trays wedging needs a feature to bottom out on, but "no internal features" rules one out on the inside, and a clean inner face means a clean outer face too. The brief contradicted itself, so my first engineering task was to prove that in numbers rather than argue it in a meeting.
Quantify the conflict, then hide the solution in plain sight
- 01Write the nesting condition. For one tray to enter another, the inside at the entry plane has to clear the outer wall of the tray above. Over a nesting depth h, at draft angle α and wall thickness t, that's 2h·tan α ≥ 2t + c, with c the running clearance.
- 02Put the trade-off in front of the stakeholders. With the outer and inner dimensions both fixed, h and t were fixed too, leaving draft as the only free variable. I mapped the draft required against nesting height and wall thickness with hand calculations and took the chart to the team, so the decision was made on the numbers.
- 03Make the anti-wedge feature something users want anyway. Draft alone means trays jam on the taper. I added external ribs on the tray wall, designed as handles, so the tray bottoms out on the ribs instead. They stop the wedge, stiffen a large thin-walled moulding against warp, and leave a gap to get your fingers under.
- 04Tolerance every way the parts meet. Lid on tray (seal and rattle), lid in tray (drop-in clearance), tray in tray (nest depth and wedge) and tray on lid (stack stability) are four different loops through the same features, so each got its own tolerance stack. Contributors included cavity dimensions, mould shrinkage across a large PP part, warp from uneven cooling, base flatness and the position of the rib seats.
- 05Turn pass/fail into a scrappage rate. Treating each contributor as normal and independent, σgap = √Σσi² and Z = (gmin − μgap) / σgap, so Φ(Z) predicts the fraction of assemblies that wedge or rattle. That let me tighten the rib seat tolerance where it was worth paying for and open everything else up.
- 06Work through the DFM with the toolmaker. Draft analysis on the production part, and a wall thickness, flow and stiffness trade: a 250:1 flow-length ratio for the chosen PP grade over a 310 mm longest flow path meant a wall of at least 1.25 mm to fill in theory. Tapered internal walls were engineered for clean, damage-free dough release.
Requirements met, a compromise found for the conflict, and into production
The trays nest without wedging, bottom out on a defined feature, have clean internal faces and fit in a domestic fridge. They hold six dough balls and are tall enough to bulk prove them too, and they work with the Pizza Prep Lid to extend the range.
The scrappage the stack predicted was borne out in production, with low scrappage and low failure, and CMM inspection of the first articles confirmed the rib seats and base flatness sat where the analysis said they would. The trays now sit at 4.8 stars across 460+ reviews.
The same process, on your product
Turning a wish list into a specification you can actually build, then proving the tolerances before the tool is cut, is the core of Manufacturing Preparation. If your brief has requirements pulling against each other, a Feasibility Study is a good place to find out early.